Project Tempo
We have been engaged by ISG to undertake Top Down roof demolition C.2000m2 of roofing, structural alterations and controlled demolition on lift shafts, staircases and RC slabs, glazing and stone cladding removal c.5000m2 of glazing, basement drainage, forming concrete pile caps, RC repairs, RC column strengthening, concrete slabs and metal deck in the new atrium infill areas and a reduced level dig c.300m2.
The project value for this project is £1.9m, with a total duration of 34 weeks for demolition, ground works placement of concrete to infills/metal deck and structural alterations.
Client
ISG
Service
Construction
Sector
Commercial
The Works
Demolition, Structural alterations and Ground works